Oliver Bridge to close for routine inspection

The Oliver Bridge, located over the St. Louis River at the junction of Minnesota Highway 39 and Wisconsin Highway 105, will close daily from 8:30 a.m. to 4:30 p.m., Monday, Aug. 27 through Friday, Aug. 31 for a scheduled inspection.

The bridge will not close until 8:30 a.m. each day and all equipment will be removed from the bridge and the bridge will be re-opened to traffic by 4:30 p.m. each day.

Changeable message signs will be in place by Tuesday, August, 21 to let bridge users know about the upcoming daytime closures. The signs will remain in place until the inspection work is completed.

You May Also Like